Products & Services

New Construction | Repair and Reconstruction | Milling | Seal Coating | Crack Sealing
Striping | Fabric Membrane Installation | Concrete

Click HERE for Residential Products & Services Information

New Construction

From private driveways to highways Pro-Pave, Inc. has state of the art equipment and experienced personnel to get the job done right the first time. Pro-Pave, Inc. has a long history of success working with the Washington Metropolitan Area’s largest and most respected construction companies and general contractors. As a Virginia Department of Transportation (VDOT) certified asphalt paving operation, Pro-Pave, Inc. guarantee’s a high level of attention to detail and project specifications.

Contact our New Construction Bids department.

Repair and Reconstruction

Full Depth Patching:
Full Depth Patching consists of jack hammering and saw cutting or machine milling to a specified depth. We dispose of the excavated material and re-compact the underlying area to 95%. After compaction but prior to the placing of asphalt, the vertical edges of the existing pavement will receive a tack coat of liquid asphalt binder. Asphalt is installed in two lifts of no less than 1.5 inches and no greater than 4 inches in compacted thickness, per lift. Total thickness of asphalt patch will be indicated on the bid proposal. The surface, when completed will be smooth, bonded, and of a uniform texture and appearance. The finished edges will be tack coated with liquid asphalt and sanded, to prevent tracking.

Overlay Existing Surface:
When overlaying existing asphalt all areas will be swept clean and a tack coat will be applied to bond the new asphalt to the existing surface. All low areas will be leveled with asphalt prior to the installation of the new surface. The new surface mix asphalt will be installed at a specified depth, per the bid proposal, and compacted to achieve a smooth and uniform surface.

Milling:

We can handle any size milling job. We can mill from one inch to one foot of asphalt and aggregate base making removal much quicker, cleaner and cost effective. Cold Planing (also known as rotomilling) is the process of the controlled removal of an existing surface of an asphalt or concrete street or parking lot. This process allows the owner to keep the existing profile of the project while restoring it to its original usability. The recycling of the milled material is economically and environmentally very beneficial to all involved in the process.

Edge Milling:
Edge milling consists of milling all edges of existing asphalt adjacent to the gutter pan or any metal structure for a smooth tie-in. The milling consists of a 48” width and is completed with a rotary-drum milling machine.

Seal Coating

Asphalt seal coats are factory-blended compounds of emulsified asphalt binder and selected mineral and fiber fillers. Seal coats are intended to protect pavement from the effects of weather erosion and oxidation, fill minor voids, improve the surface texture and provide a smooth, non-abrasive surface. Recommended for use on all types of asphalt pavements, seal coat provides a uniformly colored watertight seal. Seal coat is applied in two coats unless otherwise noted. We prefer the finished seal coat not be subjected to heavy traffic earlier than 12 to 24 hours after having been laid.


Crack Sealing

The constant exposure to the sun and water is pavements greatest enemy. Oxidation from the sun causes shrinkage and separation of the asphalt surface resulting in cracks. Left untreated the damage will penetrate the pavements subsurface and soften it. In no time, new cracks and potholes will appear. Your first defense against pavement deterioration is Crack Sealing. This is done to prevent the deterioration of the sub-base by water and debris. The thorough cleaning of affected areas and the application of crack sealant will prevent further erosion of the surface and damage to the structural support of the pavement. The material used is designed to expand and shrink allowing for year round performance. Without prompt attention, areas around the pavement will also begin to fail as a result of increased oxidation. The main crack will not only get larger, but additional cracking will also appear. By sealing cracks early you can extend the life of your pavement considerably and prevent more costly repairs. Crack Sealing asphalt pavement joints and straight-line cracking consists of cleaning debris and grass from the cracks and sealing them with a hot applied rubberized crack sealer.

Striping

Customers appreciate a well designed and well marked parking system. The parking lot is the first thing that customers or visitors see. A freshly painted parking lot can lend an attractive impression to the overall image of your property.

Pro-Pave, Inc. offers complete layout and line striping services using the best striping equipment and quality paint available. Resurfaced areas are marked with appropriate parking spaces, directional arrows, fire lanes, handicapped stalls and any other items currently
painted with traffic paint or Thermoplastic Striping.

Fabric Membrane Installation

We are qualified installers of Mirapave Paving Fabrics, a product installed prior to asphalt overlaying. This product retards reflection cracking, reduces secondary cracking, improves pavement fatigue life, and protects sub-grade from water intrusion. Fabric installation enhances the longevity of any overlaying job. For more information on Mirapave Paving Fabrics:
http://www.mirafi.com/products/product_mpave_index2.html

Concrete

Pro-Pave, Inc. has experience in both commercial and residential concrete applications. Our paving crews are trained in the most recent procedures for producing quality concrete surfaces including sidewalk and apron construction and repair. Pro-Pave, Inc. can also break, raise, and replace curbs and gutters to correct drainage and safety issues.